Let us help you search
Recommended Searches:
"PD HOUSE" is ready to assist on your behalf. It will also assist to save money on multiple things that happened.
You may analyse the specifics and compare them with the following objects.
  • Service Area
  • General Service
  • Housing Loan Service
  • Home Design
  • Warranty
  • Apply for house building service
  • Contract Signing
  • Term of Payment for Multi-Joint Lock System
  • Term of Payment for Cast-in-place System
  • Service Area
  • General Service
  • Housing Loan Service
  • Home Design
  • Warranty
  • Apply for house building service
  • Contract Signing
  • Term of Payment for Multi-Joint Lock System
  • Term of Payment for Cast-in-place System
Service Area

 

Bangkok and vicinity/Central Bangkok, Pathum Thani,  Nonthaburi, Nakon Pathom, Nakorn Nayok, Saraburi, Kanchanaburi, Ratchaburi, Ayutthaya, Lop Buri, Ang Thong, Sing Buri, Chai Nat, Uthai Thani, Samut Prakan, Samut Sakhon, Samuts Songkram, Supanburi, Petchaburi

Eastern

Chon Buri, Rayong, Chachoengsao, Prachin Buri, Chanthaburi, Sra Kaeo

Northern

Chiang Mai, Chiang Rai, Phitsanulok, Nakhon Sawan, Phichit, Uttaradit, Kamphaeng Phet, Sukhothai, Lamphun, Lampang, Phayao, (Petchaboon, Tak, Phrae and Nan will be considered by case)

Northeastern

Nakhon Ratchasima, Khon Kaen, Buri Ram, Surin, Udon Thani, Ubon Ratchathani, Chaiyaphum, Sakon Nakorn, Roi Et, Nakorn Phanom, Mookdahan, Maha sarakham, Kalasin, Si Sa Ket, Amnat Chareon, Yasothon (Nong Khai, Bung kan, Nong Bua Lumpo, Loe will be considered by case)

Southern

Prachuap Khiri Khan, Chumphon, Nakhon Si Thammarat, Surat Thani, Songkhla(Hat Yai), Phuket, Phatthalung, Krabi, Phangnga, Ranong (Trang, Satul will be considered by case)

Service Conditions

1.The land must be easily accessed by large vehicles in the transporting of construction materials. This excludes any road tolls.

2. The main water pipe and main electricity cable must be available on your land in order to facilitate the construction of the home.

3. In case the public drainage system is not yet available on the land, the septic tank will be connected to the house drainage pipe.

4. The customer must be the land owner otherwise a letter of consent from the owner must be submitted.

General Service

The company provides these services to our customers.

No.

Description

Operation cost (baht)

Fee(baht)

1.

Apply for a construction permit
(Company bears the expense)

-

-

2.

Apply for construction permit
(Company bear the expense)

-

-

3.

Apply for a temporary water meter (Metropolitan)

5,350

 

 

Apply for a temporary water meter (Provincial)

3,600

5,350

 

(Company bears the expense  excluding the service area extension fee)

 

 

4.

Apply for a temporary electricity meter (Metropolitan)

400

10,000

 

Apply for a temporary electricity meter (Provincial)

 

10,000

 

(Company bears the expense service area extension fee)

 

 

5.

Apply for a permanent water meter 1/2” (Metropolitan)

107

-

 

Apply for permanent water meter 1/2” (Provincial)

535

 

 

Customer bears the service area extension fee (if any)

 

 

 

Fees and deposit are covered by the company for the Exclusive II and Luxury II Series construction material (Service area extension fee excluded)

 

 

6.

Apply for a permanent electricity meter (Metropolitan)

 

 

 

15 Amps 1 Phase (Smart II Series)

700

-

 
15 Amps 3 Phase (Exclusive II Series)
 

700

-

 

30 Amps 3 Phase (Luxury II Series)

1,500

 

    

 

Customer bears the service area extension fee (if any)

 

 

 

Fees and deposit are covered by company for the Exclusive II and Luxury II Series construction material (Service area extension fee excluded)

 

 

7.

Apply for permanent electricity meter (Provincial)

 

 

 

15 Amps 1 Phase (Smart II Series)

700

-

 

15 Amps 3 Phase (Exclusive II Series)

700

-

 

30 Amps 3 Phase (Luxury II Series)

1,500

 

 

Customers bears the service area extension fee (if any)

 

 

 

Fee and deposit are covered by company for the Exclusive II and Luxury II Series construction material (Service area extension fee excluded)

 

 

The company will apply for the above services with the government authorities on your behalf until completed. In case the customers would like to change the size of the electricity meter specified by the company, please inform us on the day the contract is signed or prior to the beginning of the construction because the main cable must be prepared (additional cost).

Housing Loan Service

In case you are interested to apply for housing loan service, we are pleased to facilitate the Bank on your behalf. The major banks that provide special conditions for our customers are 
 

  • Siam Commercial Bank (www.scb.co.th/th/personal-banking/loans/home-loan/home-builder)
  • Government Housing Bank (www.ghbank.co.th/product/loan)
  • Bank of Ayudhaya (www.krungsri.com/th/personal/loans/home-loans/home-construction)
  • The basic conditions for housing loan are:

    1.The land must be free from any mortgage. In case there are co-owners, the co-owners must sign the letter of consent.
    2.Land and building must be mortgaged to the bank. The owner must buy fire insurance policy with the insurer recommended by the bank.
    3.Your monthly income (include your spouse) should be 2 times of the amount to be paid to the bank. For example, if the amount to be paid monthly is 10,000 baht, your monthly income should be 20,000 baht (approximately).
Home Design

PD House offers a variety of house designs for your selection or inspiration. Our professional sales consultant and architects are ready to provide expert advice, with the following details:
 

1.

We offer over 200 house designs to cater to all tastes and preferences, ensuring they meet the needs and status of everyone. You can make your decision, reserve, and proceed with construction with us immediately.

2.

If our house designs do not fully meet your specific needs, we are happy to provide advice and make adjustments according to your preferences (any changes, whether additions or reductions, will be priced fairly based on actual construction costs).

3.

If you wish to have a custom house design tailored specifically for you, we are pleased to offer specialized design services by expert architects, with consultation (the service fee is based on the standard rates of the Association of Siamese Architects).

4.

When you decide to entrust PD House with the construction, the deposit will be considered part of the payment towards the house construction.

Warranty
1.20 years warranty for the structure of the house. Exclude the road and floor casted on ground.
2.2 years warranty for general work for Exclusive II and Luxury II Series standard construction material
1 year warranty for general work for Smart II Series standard construction material. 
Exclude natural depreciation of materials due to long used and misused.
3.5 years warranty for roof tiles (by the manufacturer and installer)
4.10 years warranty for rustproof roof structure (by the manufacturer and installer)
5.10 years warranty for laminated floor (by the manufacturer and installer)
Apply for house building service

If you decide to have the company build your house, the Application form for house building service should be filled and submitted. Detail as follow:
 

No 

House Price

Advance payment
(Baht)
1.House price does not exceed 2 million baht

30,000

2.House price more than 2 million baht but not exceed 5 million baht

50,000

3.House price more than 5 million baht

100,000

4.Customers’ own house design 

3%
 (not exceed 
100,000 baht)

Documents 
1. 4 copies of Title Deed with verified signature (the same size of original copy)
2. 4 copies of ID card and house registration with verified signature
3. A copy of tax payment receipt with verified signature

Our survey officer will survey the land and the access road to the land to mark the lay out. If the construction site cannot be accessed due to too narrow road, the advanced payment will be refunded

Contract Signing

          When the land survey result, the list of standard materials and the house plan are agreed, the contract must be signed so the company can proceed for the construction permit.
          The advance payment will be refunded on the day the contract is signed. 
          If there is any additional construction made after the contract is signed, the company will propose the quotation, and the payment must be made before the additional construction starts. The duration of construction dated from the day the contract is signed and the payment for the signing contract installment is fully paid. (The piles driving work will start after the contract signing 45-60 days approximately.)
         Duration of construction for Pre-fabrication & Multi-Joint Lock System      
(Since contract signing date) 

No 

House Price

Duration of construction 

1.

House price does not exceed 2 million baht

8 - 9 Months

2.

House price from 2 million baht but not exceed 4 million baht

10 - 12 Months

3.

House price from 4 million baht but not exceed 6 million baht

13 - 14 Months

4.

House price from 6 million baht but not exceed 10 million baht

15 - 18 Months

5.

House price from 10 million baht but not exceed 20 million baht

19 - 21 Months

6.

House price from 20 million baht but not exceed 30 million baht

22 - 27 Months

7.

House price from 30 million baht but not exceed 40 million baht

28 - 35 Months

8.

House price from 40 million baht but not exceed 50 million baht

36 Months


Duration of construction for Cast-in-place structure (since contract signing date)

No 

House Price

Duration of construction 

1.

House price does not exceed 2 million baht

10 - 11 Months

2.

House price from 2 million baht but not exceed 4 million baht

12 - 13 Months

3.

House price from 4 million baht but not exceed 6 million baht

14 - 15 Months

4.

House price from 6 million baht but not exceed 10 million baht

16 - 18 Months

5.

House price from 10 million baht but not exceed 20 million baht

19 - 23 Months

6.

House price from 20 million baht but not exceed 30 million baht

24 - 29 Months

7.

House price from 30 million baht but not exceed 40 million baht

30 - 35 Months

8.

House price from 40 million baht but not exceed 50 million baht

36 Months

Remark:
For your confidence and to confirm that the company will complete the construction within the duration stated in the contract, the company agrees to pay the fine 0.01% of the house price if the company cannot hand over the house to the customers on time.

Term of Payment for Multi-Joint Lock System

Term of Payment 
Table of payment for Prefabrication & Multi-Joint Lock System 
One storey house, price does not exceed 5 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 15%

On the contract signing date

115%

Completion of setting out, piling work and foundation work

220%

Completion of prefabrication structure installation– columns, beams, floor, roof beam, galvanized roof truss installation and concrete pouring for parking floor and swimming pool (if any)

320%

Completion of eaves installation (if any), roofing materials installation, brick laying, interior plumbing (with pressure tested), PVC conduit installation (for wiring) and 50% interior wall plastering.

415%

Completion of wall plastering, interior wiring, bathroom floor and wall tiling, soffit-exterior ceiling, interior ceiling (except bathroom ceiling), skim coat plastering, primer painting and aluminum/vinyl doors and windows installation.

510%

Completion of 1 final painting, interior door panels installation, sanitary wares installation, treatment tank and drainage pipe installation and and exterior wall decorative material installation (if any).

65%

Completion of laminated floor installation, switches-outlets-lights installation, painting, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any)

 

One storey house, price 5-10 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

115%

Completion of setting out, piling work and foundation work

215%

Completion of prefabrication structure installation– columns, beams, floor, roof beam, galvanized roof truss installation and swimming pool concrete pouring (if any)

315%

Completion of eaves installation (if any), roofing materials installation, 80% brick laying and interior plumbing (with pressure tested)

415%

Completion of brick laying, PVC conduit installation (for wiring), 80% of interior wall plastering (except bathroom wall) and swimming pool concrete pouring (if any).

510%

Completion of interior wall plastering (except bathroom wall), 80% exterior wall plastering, interior wiring, air balancing system - PD Fresh Airflow Plus duct intallation (if any) and interior ceiling installation (except bathroom ceiling)

610%

Completion of wall plastering, skim coat plastering, primer painting and aluminum/vinyl doors and window installation, soffit-exterior ceiling installation and bathroom wall tiling, .

75%

Completion of bathroom floor tiles installation, sanitary wares installation, treatment tank and drainage pipe installation 1 final painting, interior door panels installation and exterior wall decorative material installation (if any).

85%

Completion of painting, laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation.

 

One storey house, price 10 million baht up with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

110%

Completion of setting out, piling work and foundation work

215%

Completion of prefabrication structure installation – column, beams, floor, roof beam and concrete roof slab (if any)

315%

Completion of galvanized roof truss installation, eaves installation (if any), roofing materials, 50% brick laying and swimming pool concrete pouring (if any).

410%

Completion of brick laying and PVC conduit installation (for wiring)

510%

Completion of interior plumbing (with pressure tested), 80% interior wall plastering and air balancing system - PD Fresh Airflow Plus duct intallation (if any).

610%

Completion of interior wall plastering (except bathroom wall), interior wiring, interior ceiling installation (except bathroom ceiling) and 50% exterior wall plastering.

75%

Completion of exterior wall plastering and soffit-exterior ceiling installation.

85%

Completion of skim coat plastering, primer painting, bathroom wall tiling and aluminum/vinyl doors and window installation.

95%

Completion of 1 final painting, interior door panels installation, bathroom floor tiles installation, sanitary wares installation, treatment tank and drainage pipe installation and exterior wall decorative material installation (if any).

105%

Completion of painting, laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).

 

Two storey house, price not exceed 6 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

120%

Completion of setting out, piling work and foundation work

220%

Completion of prefabrication structure installation – columns, beams, floor, stair, roof beam and galvanized roof truss installation

315%

Completion of eaves installation (if any), roofing materials installation, brick laying, interior plumbing (with pressure tested) and PVC conduit installation (for wiring).

410%

Completion of interior plastering (except bathroom wall), 50% exterior plastering, interior wiring and interior ceiling installation (except bathroom).

510%

Completion of wall plastering, skim coat plastering, primer paintingsoffit-exterior ceiling installation, bathrooms wall and floor tiling and aluminum/vinyl doors and windows installation.

610%

Completion of sanitary wares installation, treatment take and drainage pipe installation,1 final painting, interior door panels installation, wooden stairs installation, and exterior wall decorative materials installation (if any)

75%

Completion of painting, laminated floor installation, switches-outlets-lights installation, and interior air balancing system - PD Fresh Airflow installation.

 

Two storey house, price 6 -12 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

120%

Completion of setting out, piling work and foundation work

220%

Completion of prefabrication structure installation - columns, beams, floor, stair, roof beam, concrete roof slab (if any) and galvanized roof truss installation

310%

Completion of eaves installation (if any), roofing materials installation, 80% brick laying, interior plumbing (with pressure tested).

410%

Completion of brick laying, PVC conduit installation (for wiring), 80% wall plastering (except bathroom wall), air balancing system - PD Fresh Airflow Plus duct intallation (if any) and swimming pool concrete pouring (if any).

510%

Completion of interior wall plastering, 80% exterior wall plastering, interior wiring and interior ceiling installation.

610%

Completion of wall plastering, 50% of bathroom wall tiling, skim coat plastering, primer painting, soffit-exterior ceiling installatin and aluminum/vinyl doors and windows installation.

75%

Completion of bathroom wall and floor tiling, sanitary wares installation, treatment take and drainage pipe installation, 1 final painting, interior door panels installation, wooden stairs installation, and exterior wall decorative materials installation (if any)

85%

Completion of painting, laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).

 

Two storey house, price 12 -20 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

110%

Completion of setting out and piling work.

210%

Completion of foundation work and prefabrication structure installation - 1st floor columns and beams.

310%

Completion of prefabrication structure installation - 1st floor - floor and 2nd foor - columns and beams.

410%

Completion of prefabricaiton structure installation - 2nf floor - floor, stair, roof bream, concrete slab roof (if any) and galvanized roof truss installation.

510%

Completion of eaves installation (if any), roofing materials installation and 50% brick laying.

610%

Completion of brick laying, interior plumbing (with pressure tested) and swimming pool concrete pouring (if any)

75%

Completion of PVC conduit installation (for wiring), 80% interior wall plastering and air balancing system - PD Fresh Airflow Plus duct intallation (if any)

85%

Completion of interior wall plastering (except bathroom wall), interior wiring and interior ceiling installation (except bathroom ceiling).

95%

Completion of 80% exterior wall plastering

105%

Completion of wall plastering and soffit-exterior ceiling installation.

115%

Completion of bathroom wall tiling, skim coat plastering, primer paint and aluminum/vinyl doors and windows installation.

123%

Completion of bathroom floor tiling, sanitary wares installation, treatment take and drainage pipe installation, 1 final painting, interior door panels installation, wooden stairs installation, and exterior wall decorative materials installation (if any)

132%

Completion of painting, laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).

 

Two storey house, price 20 million baht up with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

110%

Completion of setting out and piling work.

210%

Completion of foundation work and prefabrication structure installation - 1st floor columns and beams.

310%

Completion of prefabrication structure installation - 1st floor - floor and 2nd foor - columns and beams.

410%

Completion of prefabricaiton structure installation - 2nf floor - floor, stair, roof bream, concrete slab roof (if any) and galvanized roof truss installation.

55%

Completion of eaves installation (if any), roofing materials installation and 50% brick laying.

65%

Completion of brick laying, interior plumbing (with pressure tested) and swimming pool concrete pouring (if any)

75%

Completion of PVC conduit installation (for wiring), 80% interior wall plastering, air balancing system - PD Fresh Airflow Plus duct intallation (if any) and parking concrete floor.

85%

Completion of interior wall plastering (except bathroom wall), interior wiring and interior ceiling installation (except bathroom ceiling).

95%

Completion of 50% exterior wall plastering

105%

Completion of wall plastering and soffit-exterior ceiling installation.

115%

Completion of exterior ceiling installation, bathroom wall tiling and bathroom ceiling installation.

125%

Completion of bathroom floor tiling, skim coat plastering, primer paint and aluminum/vinyl doors and windows installation.

135%

Completion of 1 final painting, interior door panels installation, wooden stairs installation, and exterior wall decorative materials installation (if any)

143%

Completion of sanitary wares installation, treatment take and drainage pipe installation, painting and laminated floor installation installation.

152%

Completion of laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).

 

Three storey house, price not exceed 8 million bath with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

115%

Completion of setting out, piling work and foundation work

220%

Completion of prefabrication structure installation - columns, beams, floors, roof beam, concrete roof slab (if any) and stairs for the 1st-2nd and 3rd floor.

315%

Completion of galvanized roof truss installation , eaves installation (if any), roofing material installation, 80% bricks laying and interior plumbing (with pressure tested)

410%

Completion of brick laying, PVC conduit installation (for wiring), 80% interior wall plastering (except bathroom wall) and swimming pool concrete pouring (if any)

510%

Completion of interior wall plastering, interior wiring, interior ceiling installation (except bathroom ceiling) and 80% exterior wall plastering.

610%

Completion of wall plastering, 50% bathroom wall tiling, skim coat plastering, primer paint, aluminum/vinyl doors and windows installation and soffit-exterior ceiling installation.

75%

Completion of bathroom floor-wall tiling, sanitary wares installation, treatment take and drainage pipe installation, 1 final painting, interior door panels installation, wooden stairs installation, and exterior wall decorative materials installation (if any)

85%

Completion of painting, laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).


Three storey house, price 8 -15 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

115%

Completion of setting out, piling work and foundation work

215%

Completion of prefabrication structure installation - 1st floor - columns, beams and floor, 2nd foor - columns, beams, floor and stairs to 2nd floor, 3rd floor - beams.

310%

Completion of prefabrication structure installation - 3rd floor - columns and floor, roof beams, stairs to 3rd floor, concrete roof slab (if any) and galvanized roof truss installation.

410%

Completion of eaves installation (if any), roofing material installation, 50% bricks laying and in swimming pool concrete pouring (if any).

510%

Completion of brick laying, interior plumbing (with pressure tested) and PVC conduit installation (for wiring).

65%

Completion of interior wall plastering (except bathroom wall), air balancing system - PD Fresh Airflow Plus duct intallation (if any) and interior wiring.

75%

Completion of 50% exterior wall plastering and interior ceiling installation (except bathroom ceiling).

85%

Completion of wall plastering and 50% bathroom wall tiling.

95%

Completion of bathroom wall and floor tiling, skim coat plastering, primer paint, aluminum/vinyl doors and windows installation and soffit-exterior ceiling installation.

105%

Completion of sanitary wares installation, treatment take and drainage pipe installation, 1 final painting, interior door panels installation, wooden stairs installation, laminated floor installation installation and exterior wall decorative materials installation (if any)

115%

Completion of painting, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation, lift installation (if any) and swimming pool system installation (if any).

 

Three storey houses, price more than 15 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

115%

Completion of setting out, piling work and foundation work

215%

Completion of prefabrication structure installation - columns, beams, floor for 1st and 2nd floor and stair for 2nd floor.

37.5%

Completion of prefabrication structure installation - columns, beams, floor for 3rd floor and stair for 3rd floor.

47.5%

Completion of prefabrication structure installation - roof beams, concrete roof slab (if any) and galvanized roof truss installation.

57.5%

Completion of eaves installation (if any), roofing material installation, 50% bricks laying, parking and swimming pool concrete pouring (if any).

67.5%

Completion of bricks laying, interior plumbing (with pressure tested) and PVC conduit installation (for wiring).

75%

Completion of interior wall plastering (except bathroom wall), air balancing system - PD Fresh Airflow Plus duct intallation (if any) and interior wiring.

85%

Completion of 50% exterior wall plastering and interior ceiling installation (except bathroom ceiling).

95%

Completion of wall plastering (except bathroom wall) and 50% bathroom wall tiling.

105%

Completion of bathroom floor-wall tiling, skim coat plastering, primer paint, aluminum/vinyl doors andwindows installation and soffit-exterior ceiling installation.

115%

Completion of sanitary wares installation, treatment take and drainage pipe installation, 1 final painting, interior door panels installation, wooden stairs installation, and exterior wall decorative materials installation (if any)

125%

Completion of painting, laminated floor installation, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).

 

Four storey house, price not exceed 20 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

110%

Completion of setting out, piling work and foundation work

210%

Completion of prefabrication structure installation - columns, beams, floor for 1st and 2nd floor and stair for 2nd floor.

310%

Completion of prefabrication structure installation - columns, beams, floor for 3rd-4th floor and stair for 3rd-4th floor.

410%

Completion of prefabrication structure installation - roof beams, concrete roof slab (if any) and galvanized roof truss installation.

510%

Completion of eaves installation (if any), roofing material installation and 50% bricks laying.

610%

Completion of bricks laying, interior plumbing (with pressure tested), PVC conduit installation (for wiring) and swimming pool concrete pouring (if any)

75%

Completion of interior wall plastering (except bathroom wall), air balancing system - PD Fresh Airflow Plus duct intallation (if any) and interior wiring.

85%

Completion of 50% exterior wall plastering and interior ceiling installation (except bathroom ceiling).

95%

Completion of wall plastering and 50% bathroom wall tiling.

105%

Completion of bathroom wall tiling, skim coat plastering, primer paint and aluminum/vinyl doors andwindows installation.

115%

Completion of bathroom floor tiling, 1 final painting, interior door panels installation,and exterior wall decorative materials installation (if any)

123%

Completion of sanitary wares installation, treatment take and drainage pipe installation, wooden stairs and laminated floor installation installation.

132%

Completion of painting, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any).

 

Four storey houses, price exceed 20 million baht with Prefabrication & Multi-joint Lock System

Installment

Payment

Description

 10%

On the contract signing date

16%

Completion of setting out, piling work and foundation work

27%

Completion of prefabrication structure installation - columns, beams and floor for 1st floor.

37%

Completion of prefabrication structure installation - columns, beams, floor and stairs for 2nd floor.

47%

Completion of prefabrication structure installation - columns, beams, floor and stairs for 3rd floor.

57%

Completion of prefabrication structure installation - columns, beams, floor and stairs for 4th floor.

66%

Completion of prefabrication structure installation - roof beams, concrete roof slab (if any) and galvanized roof truss installation.

710%

Completion of eaves installation (if any), roofing material installation, 50% bricks laying and swimming pool concrete pouring.

810%

Completion of bricks laying, PVC conduit installation (for wiring) and interior plumbing (with pressure tested).

95%

Completion of interior wall plastering (except bathroom wall), air balancing system - PD Fresh Airflow Plus duct intallation (if any) and interior wiring.

105%

Completion of 50% exterior wall plastering and interior ceiling installation (except bathroom ceiling).

115%

Completion of wall plastering, soffit-exterior ceiling installation and 50% bathroom wall tiling.

125%

Completion of bathroom wall tiling, skim coat plastering, primer paint and aluminum/vinyl doors andwindows installation.

135%

Completion of bathroom floor tiling, 1 final painting, interior door panels installation,and exterior wall decorative materials installation (if any)

143%

Completion of sanitary wares installation, treatment take and drainage pipe installation, wooden stairs and laminated floor installation installation.

152%

Completion of painting, switches-outlets-lights installation, interior air balancing system - PD Fresh Airflow installation, lift (if any) and swimming pool system installation (if any).

 

Term of Payment for Cast-in-place System

Term of Payment 
Table of payment for Cast-in-place System


One storey house, price not exceed 5 million baht with Cast-in-place structure

Installment

Payment

Description

 

10%

On the contract signing date

1.

20%

Completion of setting out, piling work, foundation work and ground beams.

2.

20%

Completion of reinforced concrete structure work - column, floor, roof beam, concrete roof slab (if any) and swimming pool concrete pouring (if any).

3.

20%

Completion of galvanized roof truss installation, eaves installation (if any), roofing materials installation, brick laying, interior plumbing (with pressure tested), PVC conduit installation (for wiring) and 50% interior wall plastering.

4.

15%

Completion of wall plastering, interior wiring, bathroom floor and wall tiling, soffit-exterior ceiling, interior ceiling (except bathroom ceiling), skim coat plastering, skim coat plastering, primer painting and aluminum/vinyl doors and windows installation.

5.

10%

Completion of sanitary wares installation, treatment tank and drainage pipe installation, 1 final painting interior door panels installation and exterior wall decorative material installation (if any).

6.

5%

Completion of laminated floor installation, switches-outlets-lights installation, painting, interior air balancing system - PD Fresh Airflow installation and swimming pool system installation (if any)

 

One storey house, price 5-10 million baht with Cast-in-place structure

Installment

Payment

Description

 

10%On the contract signing date

1.

15%Completion of setting out, piling work, foundation work and ground beams

2.

15%Completion of reinforced concrete structure work - columns, floors, roof beams, roof slab (if any), roof truss installation (if any), parking floor (if any) and concrete pouring for swimming pool (if any)

3.

15%Completion of eaves installation (if any), roofing materials installation, 80% brick laying, internal plumbing (with pressure tested), 

4.

15%Completion of 100% brick laying, PVC conduit installation (for wiring) and 80% interior wall plastering (except bathroom wall).

5.

10%Completion of 100% interior wall plastering, 80% exterior wall plastering, interior wiring, interior ceiling installation (except bathroom ceiling)

6.

10%Completion of vinyl doors and windows installation, 100% exterior wall plastering, exterior ceiling installation, bathroom wall tiling and primer painting.

7.

5%Completion of interior door panels installation, bathroom floor tiling, sanitary wares installation, treatment tank and drainage pipe installation, 1 final painting, and exterior wall decorative materials installation (if any).

8.

5%Completion of flooring materials installation, switches-outlets installation, final painting, swimming pool system installation and completion of construction

 

One storey house, price exceed 10 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out, piling work, and foundation work.

10%

2.

Completion of reinforced concrete structure work - columns, beams, floors, and concrete pouring for swimming pool (if any)

10%

3.

Completion of reinforced concrete structure work - roof beams, roof slab (if any), roof truss installation (if any), and 50% brick laying.

10%

4.

Completion of eaves installation (if any), roofing materials installation, 100% brick laying, and PVC conduit installation (for wiring).

10%

5.

Completion of internal plumbing (with pressure tested), 80% wall plastering and parking floor (if any).

10%

6.

Completion of 100% interior wall plastering, 50% exterior wall plastering, interior wiring, interior ceiling installation (except bathroom ceiling)

10%

7.

Completion of 100% exterior wall plastering and exterior ceiling installation. 

10%

8.

Completion of vinyl doors and windows installation, and bathroom wall tiling and primer painting.

10%

9.

Completion of interior door panels installation, bathroom floor tiling, sanitary wares installation, treatment tank and drainage pipe installation, 1 final painting, and exterior wall decorative materials installation (if any).

5%

10.

Completion of flooring materials installation, switches-outlets installation, final painting, swimming pool system installation and completion of construction

5%

 

Two storey houses, price not exceed 3 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out, piling work, foundation work and ground beam.

10%

2.

Completion of reinforced concrete structure work – 1st floor columns, floor and 2nd floor beams.

15%

3.

Completion of reinforced concrete structure work – 2nd floor columns, floor and roof beams.

15%

4.

Completion of roof truss installation (except lower roof), fascia (if any), roofing materials installation (except lower roof-later) and 50% brick laying.

15%

5.

Completion of 100% brick laying, internal plumbing (pressure tested), PVC conduit installation (for wiring), and 50% interior wall plastering.

10%

6.

Completion of 100% wall plastering, exterior ceiling installation, bathroom wall tiling, vinyl doors and windows installing, interior ceiling installation, interior wiring, lower roof truss and roofing material installation (if any) and primer paint. 

10%

7.

Completion of bathroom floor tiling, stairs installation, sanitary wares installation, treatment tank and drainage pipe installation, internal door panels installation and 1 final painting.

10%

8.

Completion of flooring materials, switches-outlets installing, final painting and completion of construction.

5%

 

Two storey house, price 3 -10 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out, piling work and foundation work

10%

2.

Completion of reinforced concrete structure work – 1st floor beams, columns, and floor.

10%

3.

Completion of reinforced concrete structure work – 2nd floor beams, columns, and floor.

10%

4.

Completion of reinforced concrete structure work - roof beam, roof truss installation (except lower roof) and 50% brick laying,

10%

5.

Completion of fascia (if any), roofing materials installation (except lower roof-later) and 100% brick laying, internal plumbing (pressure tested), PVC conduit (for wiring) installation and parking floor (if any)

10%

6.

Completion of 80% interior wall plastering, 50% exterior wall plastering and internal wiring.

10%

7.

Completion of 100% wall plastering, exterior ceiling and interior ceiling installation (except bathroom ceiling) 

10%

8.

Completion of vinyl doors and windows installation, bathroom floor and wall tiling and primer painting.

10%

9.

Completion of internal door panels installation, stairs installation, sanitary wares installation, treatment tank and drainage pipe installation, 1 final painting.

10%

10.

Completion of flooring materials, switches-outlets installing, final painting and completion of construction.

5%

 

Two storey house, price 10-20 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out and piling work

10%

2.

Completion of reinforced concrete structure work – foundation, 1st floor beams and columns

10%

3.

Completion of reinforced concrete structure work – 1st floor concrete floor, and 2nd floor beam.

10%

4.

Completion of reinforced concrete structure work – 2nd floor columns and floor

10%

5.

Completion of reinforced concrete structure work - roof beam, 50% brick laying, roof truss installation (except lower roof)

10%

6.

Completion of roofing materials and fascia (if any) installation (except lower roof), 100% brick laying, PVC conduit installation (for wiring) and 50% interior wall plastering.

10%

7.

Completion of 100% interior wall plastering, internal wiring, internal plumbing (pressure tested) and 50% exterior wall plastering.

5%

8.

Completion of 80% exterior wall plastering, exterior and interior ceiling installation (except bathroom ceiling)

5%

9.

Completion of 100% exterior wall plastering, vinyl door and window installation, internal door installation, bathroom wall tiling and lower roof truss and roofing material installation (if any)

5%

10.

Completion of bathroom floor tiling, primer painting and1 final painting.

5%

11.

Completion of stairs installation, sanitary wares installation, treatment tank and drainage pipe installation

5%

12.

Completion of flooring materials, switches-outlets installation, final painting, and completion of construction.

5%

 

Two storey houses, price exceed 20 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out and piling work

10%

2.

Completion of reinforced concrete structure work – foundation, 1st floor beams and columns.

10%

3.

Completion of reinforced concrete structure work – 1st floor concrete floor, and 2nd floor beam.

10%

4.

Completion of reinforced concrete structure work – 2nd floor columns and floor

10%

5.

Completion of reinforced concrete structure work - roof beam and roof truss installation (except lower roof)

5%

6.

Completion of roofing materials and fascia (if any) installation (except lower roof-later) and 50% brick laying.

5%

7.

Completion of 100% brick laying and PVC conduit installation (for wiring)

5%

8.

Completion of 50% interior wall plastering, internal plumbing (with pressure tested) 

5%

9.

Completion of 100% interior wall plastering, internal wiring, and interior ceiling installation (except bathroom ceiling).

5%

10.

Completion of 80% exterior wall plastering, lower roof truss and roofing material (if any) installation

5%

11.

Completion of 100% exterior wall plastering, exterior ceiling and 50% bathroom wall tiling.

5%

12.

Completion of vinyl doors and windows installing, bathroom wall tiling and primer painting.

5%

13.

Completion of interior doors installation, bathroom floor tiling, 1 final painting.

5%

14.

Completion of stairs and flooring materials installation, sanitary wares installation, treatment tank and drainage pipe installation.

3%

15.

Completion of switches-outlets installing, final painting and completion of construction.

2%

 

Three storey house, price not exceed 7 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out, piling work, reinforced concrete structure work - foundation and ground beam.

10%

2.

Completion of reinforced concrete structure work – 1st floor columns, floor and 2nd floor beam

10%

3.

Completion of reinforced concrete structure work – 2nd floor columns, floor and 3rd floor beam

10%

4.

Completion of reinforced concrete structure work – 3rd floor columns, floor and roof beam

10%

5.

Completion of roof truss and eaves (if any) installation (except lower roof), roofing materials installation (except lower roof) and 50% brick laying

10%

6.

Completion of 100% brick laying, PVC conduit installation (for wiring), 80% interior wall plastering, internal plumbing (with pressure tested), and 50% exterior wall plastering

10%

7.

Completion of 100% interior-exterior wall plastering, exterior and interior ceiling installation (except bathroom ceiling), bathroom wall tiling, internal wiring and lower roof truss and roofing material (if any) installation

10%

8.

Completion of bathroom floor tiling, vinyl doors and windows installation and primer painting

10%

9.

Completion of stairs installation, sanitary wares installation, treatment tank and drainage pipe installation, interior doors installation, 1 final painting and exterior wall decoration material installation (if any)

5%

10.

Completion of flooring materials, switches-outlets installation, final painting and completion of construction.

5%

 

Three storey house, price 7-15 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out, piling work, reinforced concrete structure work - foundation and ground beam.

9%

2.

Completion of reinforced concrete structure work – 1st floor columns, floor and 2nd floor beam and concrete pouring for swimming pool (if any)

8%

3.

Completion of reinforced concrete structure work – 2nd floor columns, floor and 3rd floor beam

8%

4.

Completion of reinforced concrete structure work – 3rd floor columns, floor and roof beam

8%

5.

Completion of roof truss and eaves (if any) installation (except lower roof), roofing materials installation (except lower roof) and 50% brick laying

8%

6.

Completion of 100% brick laying and internal plumbing (with pressure tested), 

8%

7.

Completion of 80% interior wall plastering (except bathroom wall), PVC conduit installation (for wiring) and parking floor (if any)

8%

8.

Completion of 100% interior wall plastering, 50% exterior wall plastering, internal wiring and interior ceiling installation (except bathroom ceiling)

8%

9.

Completion of 100% exterior wall plastering, exterior ceiling installation, 50% bathroom wall tiling and lower roof truss and roofing material (if any) installation

5%

10.

Completion of 100% bathroom wall tiling, vinyl doors and windows installation and primer painting

5%

11.

Completion of interior doors installation, bathroom floor tiling and 1 final painting

5%

12.

Completion of stairs and flooring materials installation, sanitary wares installation, treatment tank and drainage pipe installation.

5%

13.

Completion of switches-outlets installation, final painting, swimming pool system installation (if any) and completion of construction.

5%

 

Three storey house, price exceed 15 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out and piling work

8%

2.

Completion of reinforced concrete structure work – foundation, and 1st floor beams.

7%

3.

Completion of reinforced concrete structure work – 1st floor columns, floor and 2nd floor beams and concrete pouring for swimming pool.

7%

4.

Completion of reinforced concrete structure work – 2nd floor columns, floor and 3rd floor beams

7%

5.

Completion of reinforced concrete structure work – 3rd floor columns, floor and roof beams

7%

6.

Completion of roof truss and eaves (if any) installation (except lower roof), roofing materials installation (except lower roof) and 50% brick laying

7%

7.

Completion of 100% brick laying and internal plumbing (with pressure tested)

7%

8.

Completion of 80% interior wall plastering (except bathroom wall), PVC conduit installation (for wiring) and parking floor (if any) 

7%

9.

Completion of 100% interior wall plastering, 50% exterior wall plastering, internal wiring and interior ceiling installation (except bathroom ceiling), 

6%

10.

Completion of 100% exterior wall plastering, 50% bathroom wall tiling and lower roof truss and roofing material (if any) installation

6%

11.

Completion of vinyl doors and windows installation, bathroom wall tiling, and primer painting

6%

12.

Completion of interior doors installation, bathroom floor tiling and1 final painting.

5%

13.

Completion of stairs and flooring material installation, sanitary wares installation, treatment tank and drainage pipe installation.

5%

14.

Completion of switches-outlets installing, final painting, swimming pool system installation (if any) and completion of construction.

5%

 

Four storey house, price not exceed 20 million baht with Cast-in-place structure

Installment

Description

Payment

 

On contract signing date

10%

1.

Completion of setting out, piling work and reinforced concrete foundation work.

7%

2.

Completion of ground beams

7%

3.

Completion of reinforced concrete structure work – 1st floor columns, floor and 2nd floor beam and floor.

7%

4.

Completion of reinforced concrete structure work – 2nd floor columns, and 3rd floor beams, floor and columns.

7%

5.

Completion of reinforced concrete structure work – 4th floor beams, floor, columns and roof beams.

7%

6.

Completion of roof truss and eaves (if any) installation (except lower roof), roofing materials installation (except lower roof) and 50% brick laying

7%

7.

Completion of 100% brick laying and internal plumbing (with pressure tested)

5%

8.

Completion of 80% interior wall plastering (except bathroom wall), PVC conduit installation (for wiring) and parking floor (if any)

7%

9.

Completion of 100% interior wall plastering, 50% exterior wall plastering, internal wiring and interior ceiling installation (except bathroom ceiling)

8%

10.

Completion of 100% exterior wall plastering, exterior ceiling installation, 50% bathroom wall tiling and lower roof truss and roofing material (if any) installation

8%

11.

Completion of vinyl doors and windows installation, bathroom wall tiling, and primer painting

8%

12.

Completion of interior doors installation, bathroom floor tiling and1 final painting.

7%

13.

Completion of stairs and flooring material installation, sanitary wares installation, treatment tank and drainage pipe installation.

3%

14.

Completion of switches-outlets installing, final painting and completion of construction.

2%

 

Four storey house, price exceed 20 million baht with Cast-in-place structure

Installment

Description

Payment

 

On the contract signing date

10%

1.

Completion of setting out, piling work and reinforced concrete foundation work.

7%

2.

Completion of ground beams

7%

3.

Completion of reinforced concrete structure work – 1st floor columns, floor and 2nd floor beam and floor.

7%

4.

Completion of reinforced concrete structure work – 2nd floor columns, and 3rd floor beams, floor and columns.

7%

5.

Completion of reinforced concrete structure work – 4th floor beams, floor, columns and roof beams.

7%

6.

Completion of roof truss and eaves (if any) installation (except lower roof), roofing materials installation (except lower roof) 

7%

7.

Completion of 80% brick laying and internal plumbing (with pressure tested)

5%

8.

Completion of 100% brick laying and PVC conduit installation (for wiring) 

5%

9.

Completion of 80% interior wall plastering (except bathroom wall) and parking floor (if any)

7%

10.

Completion of 100% interior wall plastering, 50% exterior wall plastering, internal wiring and interior ceiling installation (except bathroom ceiling),

5%

11.

Completion of 100% exterior wall plastering, exterior ceiling installation, 50% bathroom wall tiling and lower roof truss and roofing material (if any) installation

7%

12.

Completion of vinyl doors and windows installation, 100% bathroom wall tiling, and primer painting.

7%

13.

Completion of interior doors installation, bathroom floor tiling and1 final painting.

7%

14.

Completion of stairs and flooring material installation, sanitary wares installation, treatment tank and drainage pipe installation.

3%

15.

Completion of switches-outlets installing, final painting and completion of construction.

2%

share
 share | PD House