Dedicated Service
 

The heart of our business id appreciate to provide you with our dedecated service.

     "PD HOUSE" is devote to serve you every procedures in biulding your dream house on your hand.Our wide selections of house designed are ready to be the house of your choice.We have many solid teams of staff with more than 14 years experience to build the same quality house to your satisfactions.
      For The home construction has many procedures and relate to many government office involve to the work such as registration for construction permit, Application for electrical and water supply , registration for home address , application for telecommunication , running process for home morgate from finance Institute and also warrantee , consultancy etc.
     We are fully understood this complicated procedures. We appreciate to serve those processes for you to minimize your expenses as followings.

 
   Location of service areas
 
The area in Thailand are available to sevices as following

NORTH AREA
Chiangmai, Chiangrai, Lamphun, Lampang, Phrae, Sukhothai, Phitsanulok, Kamphaengphet, Phichit, Phetchabun, Nakhonsawan and Uttaradit.
 
CENTRAL AREA
Bangkok, Nonthaburi, Pathumthani, Samutprakan, Singburi, Lopburi, Saraburi, Angthong, Phranakhonsi Ayutthaya, Supanburi, Kanchanaburi,
Nakhonpathom, Nakhon Nayok, Ratchaburi, Samutsakhon, Samutsongkhram, Phetchaburi, Prachuapkhirikhan,Uthaithani and Chainat.
 
EASTERN AREA
Chonburi, Rayong, Prachinburi and Chachoengsao.
 
NORTH-EASTERN AREA
Nakhonratchasima, Chaiyaphum, Burirum, Khonkaen, Udonthani, Roiet, Kalasin, Mahasarakham, Loei, Nongkhai, Sakonnakhon, Nongbualamphu, Surin, Ubonratchathani and Sisaket.
 
SOUTH AREA
Phuket, Phangnga, Suratthani  Krabi ,Hayai ,Songkhla Nakhonsithammarat  andTrang.
  The land for construction site shall available transportation for delivery construction materials to site.In case of there are other expenses such as tollway, preparing of access road etc.These expenses shall extra of construction budget.
  The land shall on area of government facilities service areas both main electrical and main water supply.For the land with out public drainage system, we will provide a seep tank for drainage system.
  The land must fully authorize belong to the house owner,If not,shall legality allowable from the land owners.
   Model

1
We have more than 200 house designs for your choice. They will suit for any kinds of taste and up to your financial status.Y ou can select your favorite design, make a reservation and have us build your house at once.

2

If our designs don't exactly meet your need,we are happy to modify the design as you like.(The changes of the design may cost less or more)

3

If you want us to make a new design,our experienced architect will be happy to do that for you and give you advice.(The fee for the design is on the standard defined by the Siam Architecture Association.)

4

If you agree to have us build you house,the reservation deposit is included in the price of the house. If you want someone else to build your house,the reservation deposit will be refunded.

   General services
The company provides these services to our customers
Item Services Services Charge Free
1 Ask for building permission - -
2 Ask for house number - -
3 Ask for temporary water meter - -
4 Ask for temporary electricity meter - -
5 Ask for permanent water meter dia .3/4” - -
6 Ask for permanent electricity meter
- 15 Amps. For smart Series
- 30 Amps. For Platinum Series

-
-

-
-
7 Ask for telephone installment - As billed

Housing Loan Service
   The company will provide the service of the 7 items above with no charge. If the customer needs the electricity meter larger than the one that the company specified , please inform us when the contracted is signed or prior to the construction begin.
   If the customer wants to get the housing loan from bank , we will be a co-ordinator between the customer and the banks. The banks we have connection now are Siam Commercial Bank (www.scb.co.th) and Government Housing Bank (www.ghb.co.th). To apply for the loan , the following items are considered :-
   1. The land is free from any mort gage bond and if there is a co-right holder , he or she must comply to be a co-mortgagor.
   2. The land and the building must be mortgaged with the bank and insured against fire with the insurance company the band defined.
  3. You monthly income (together with your spouse) triple the monthly payment.( e.q. your payment is 10,000your income should 30,000 Bath

Construction Procedures

   Home morgate services
We are appreciate to service you for home mortgage procedure finance institute for your available of construction payment as the following principles

1 The land shall free of any deposit.
2 Land and home had to deposit to finance institute and also issuing assurance premium
3 Your incomes three times of monthly refund.
   Guarantee
1 Guarantee period for ain structural of house 15 years except entrance pavement and floor on ground which may regular naturally settlementation.
2 General guarantee 3 years except the depreciation due to long live material or incorrect usage.
3 Guarantee for termites prevent system 3 years by our representative termite business companies.
4 5 years guarantee for roof liles installations.
   Reservation
 
For your agree to build you house, the reservation shall be born, The process as following.

ITEM DESCRIPTION RESERVATION INSTALLMENT (BAHT)
1 Cost of house less than 3 million 50,000
2 Cost of house more than 3 million 100,000
3 The houses which is your completed drawing (Drawing of customer) 3% (not exceed) 100,000
Documentation
  1. 4 copies of the title deed to a piece of land.
  2. 4 copies of I.D. card and Home registered.
  3. 1 copy of Land Tax reciept.
          
  We will invitigate your land according to access road, house location, and facilities for construction.If not aviliable access road,we agreed to reimburse the reservation.
   Agreement
After land investing , design , and all materials are all suitably and satisfaction. Building contact agreement shall on process for the procedure to start construction later. We will refund the deposited money on the construction contract sinning dated. In case , there are some alternative after those day respectively. The negotiation to conclude every alternate and the cost due to change order shall paid in advance for construction
          Construction Period
          The construction period begin on the signing contract dated until the completed construction works construction periods as followings.
ITEM CONSTRUCTION COST CONSTRUCTION PERIOD
1 Cost less than 2 million baht 9 - 10 months
2 Cost 2 Million baht and not more than 4 Million baht 11 - 13  months
3 Cost 4 Million baht not more than 6 Million baht 14 - 15 months
4 Cost 6 Million baht not more than 10 Million baht 16 - 19 months
5 Cost More than 10 Million baht 19 months or more
Remark
  1.The specified construction period shall extend 30 days for construction the other designed home or out of Patum Design develop co.,ltd. standard plan.
  2. Panualty shall be born 300 baht per day for the construction cost not 4 million and 500 baht per day for construction case more than 4 million baht from the end of Contract period date.
   Term of payment for cast in place structure
One storey house
INSTALLMENT
PAYMENT(%)
DESCRIPTION
 
10
On the contract signing date.
1
20
Completed of Locate lay out, Piling work,Foundations and Groud beams
2
20
Compelted of Column, First floor conerete casting, Roof beams.
3
20
Completed of Roof truss, roof tiles, Mason and Erection frames of door and window 80 % (Except UPVC doors and windows)
4
15
Completed of Plastering , Ceiling (except ceiling of toilets) , Interior plumbing, Interior wiring.
5
10
Completed of Toilets Tiles , Doors and Windows panel installation , Primer painting.
6
5
Completed of Remaining works and Handover.
Two storey house which construction cost less than 3 million baht.
INSTALLMENT
PAYMENT(%)
DESCRIPTION
10
On the contract signing date.
1
10
Completed of Locate lay-out , Piling works , Foundations , Ground beams.
2
15
Completed of Columns for second floor, First floor concrete casting,Beam for second Floor.
3
15
Completed of Columns for roof beams. Second floor concrete casting, Roof beams.
4
15
Completed of Roof trusses Roof tiles (Top level only), Mason and Erection frames of door and window 50 % (Except UPVC door and windows)
5
10
Completed of Interior plastering. Interior plumbing , Interior wiring.
6
10
Completed of Exterior plastering, Doors and Windows panel installation , Ceiling ( Except Ceiling of toilets )
7
10
Completed of All floor surface materials , Stairs , Toilet tiles ,Primer painting.
8
5
Completed of Remaining works and Handover.
Two storey house which construction cost more than 3 Million Baht But not more than 10 million baht.
INSTALLMENT
PAYMENT(%)
DESCRIPTION
 
10
On the contract signing date.
1
10
Completed of Locate lay - out , Pilling wors, Foundations.
2
10
Completed of Ground beams , First floor concrete casting ,Columns for second floor.
3
10
Completed of Beams for second floor , Columns for roof bean , Second floor concrete casting.
4
10
Completed of Roof beams , Roof trusses , Mason and Erection frames of door and window 50% (Except UPVC doors and windows )
5
10
Completed of Roof tiles, (top level only ) , Interir plumbing , Mason and Erection frames of door and window 50 % , (Except UPVC doors and windows ) , Interior conduit forwiring.
6
10
Completed of Interior plastering 80 % , Exterior plastering 50 % Interior wiring.
7
10
Completed of Plastering 100 % , Ceiling (Except cioling of toilets ).
8
10
Completed of Toilet tiles , Doors and Windows panel installations, Primer painting.
9
5
Completed of All floor surface materials , Stairs.
10
5
Completed of Remaining works and Handover.
Two storey house which construstion cost more than 10 Millions bath
INSTALLMENT
PAYMENT(%)
DESCRIPTION
 
10
On the contract signing date.
1
10
Completed of Locate lay - out , Piling work.
2
10
Completed of Ground beams , Columns for support second floor.
3
10
Completed of First floor concrete casting , Beams of second floor.
4
10
Completed of Columns for support roof beams , Second floor concrete casting.
5
10
Completed of Roof beams, Roof Trusses , Mason and Erection frames of door and window 50%(Except UPVC door and window)
6
10
Completed of Roof tiles (Top level only) ,Interior plastering 50%
7
5
Completed of Exterior plastering 50% ,Interior Plumbing, Interior wiring.
8
5
Completed of Interior plastering , Ceilings (Except Ceiling of toilets)
9
5
Completed of Plastering , Doors and windows panel installation.
10
5
Completed of Toilet tiles, Primer painting.
11
5
Completed of All floor surface materials , Stairs.
12
5
Completed of Remaining works and Handover.
Three storey house
INSTALLMENT
PAYMENT(%)
DESCRIPTION
 
10
On the contract signing date.
1
10
Completed of Locate lay - out , Piling work , Foundations , Ground beams.
2
10
Completed of Columns for support second floor , First floor concrete casting , Beams for second floor.
3
10
Completed of Columns for support third floor, Second floor concrete casting ,Beams for third floor.
4
10
Completed of Columns for support roof beam, Third floor concrete casting , Roof beams.
5
10
Completed of Roof trusses , Roof tiles ( Top level only ) , Mason and Erection frames of door and window 50% (Except UPVC doors and windows)
6
10
Completed of Interior plastering 80 % , Exterior plastering 50% ,Interior plumbing ,Interior wiring.
7
10
Completed of Plastering , Ceilings (Except Ceiling of toilet)
8
10
Completed of Toilet tiles , Doors and windows panel installation , Primer painting.
9
5
Completed of All floor surface materials, Stairs.
10
5
Completed of Remaining works and Handover.
 
Degrees of comparison the advantage between services and "Classic standard" materials by PATUM DESIGN DEVELOP CO.,LTD. and general home builder.
LIST DESCRIPTION PATUM DESIGN DEVELOP CO.,LTD GENERAL HOME BUILDER
  SERVICE SCOPE    
1 Convenience Branches Bangkok and surrounding areas and Provincial branches (Chonburi , Nakron-Ratchasima). Bangkok and surrounding area only.
2 Service Areas Bangkok and surround area/ Provincial (Central, Eastern , North -Easthem as our branches indicated). Bangkok and surrounding only (Owner has to pay extra – expenses Provincial areas).
3 Expenses for temporary facilities Temporary meter for Electrical –Water supply application and monthly expenses during construction by free of charge. Born by home owner has to pay 20,000 -25,000 baht.
4 Reservation deposit Construction cost less than 3 Million 20,000 baht only. 50,000 baht.
5 Term of payment First installment 10-15%. First installment 15-20%.
6 Home designed More than 80 designs. 10-60 designs only.
7 Delayed penalty 300-500 Per day (If any). Not specified.
8 Services on design and sale period Architects and Engineers always willing to consultancy for all material selection. No / Not specified.
9 Services on construction period Completed with Architects and engineer for your consultancy during construction period. No / Not specified.
10 After sale services 12 years for structures and 3 years for general works guarantee. 1 year warrantee / 3-5 years for structures and 1 year for general work guarantee.
  MATERIAL DETAILS    
11 Piling Prestressed concrete pile I-22x18.00 m. Length. Prestressed concrete pile I-18x18.00 m Length / I-22x16.00 m. Length.
12 Structure All reinforced concrete structure. Reinforced concrete and light guage structural steel for roof beams.
13 Parking area Provide suitable P.C. pile for parking area. NO
14 Wall 'Q-CON' Light weight concrete block minimum 10 cm. thickness. Light weight concrete block 7.5 cm.thk. or common brick.
15 Frame of main entrance and toilet 'DEANG' wood 2"x5". Hard wood 2"x4".
16 Interior ceiling Decorated wooden molding 3/4"x3". No / Wooden 1/2"x 2" ordinary shape.
17 Exterior ceiling 'CONWOOD' Fiber-cement board 1/2"x 3" vent-type with emulsion paint. Hard wood 1/2"x 2" with emulsion paint.
18 Roof trusses and roof tiles Light guage structural steel ZINCALUM coated with nuts or bolts system. And 20 years guarantee / 'C-PAC' MONIOR roof tile with colour as specified. General light guage structural steel with rust – roof painted / roof tile ordinary colour.
19 First floor finished 'GALLIANT' Laminated floor with Laminated base board 1"x4". Ceramic tile.
20 Door for bedroom 'TEAK' wood. General hard wood.
21 Electrical appliances    
  - Warm water 1 Unit warm water 'NATIONAL'. No
  - Air conditioning 1 Unit Air conditioning 'NATIONAL'. No
22 Sanitary system    
  - Lay-out drainage Net exceed 20.00 m. Length. Net exceed 16.00 m. Length.
  - Toilet floor drain 2-floor drain per toilet. 1-floor drain only.
   Term of payment for Prefabrication&Multi-joint Lock System structure
Table shows divided installment for pre-cast structure Socket System 1/2552
Installments for pre-cast structure Socket System one storey house
installment
PAYMENT (%)
Descriptions

15

On the contract signing date
1
15
Completion of locate lay-out,piling work,foundation work
2
20
Completion of beams.columns, floor , roof beam and roof trusses
3
20
Completion of roof tiles,brick-laying, conduit for wiring ,Interior plumbing (pressure tested)
4
15
Completion of Interior plastering,Interior ceiling(except bathroom ceiling),Interior wiring,eave ceiling and primer painting
5
10
Completion of vinyl door and window panels installing and accessories,bathroom tiles ,1 final coating
6
5
Completion of the construction
 
Installment for pre-cast structure Socket System 2 storey house price not exceed 6 million Baht
installment
PAYMENT (%)
Descriptions
10
On the contract signing date
1
20
Completed of locate lay-out,piling work,foundation work
2
20
Completed of beam, column,first floor casting,second floor casting,roof beam,roof truss(except lower roof)
3
15
Completed of roof tiles (except lower roof),brick laying,interior plumbing,(pressure tested)brick laying,conduit For wiring
4
10
Completed of interior plastering (except bathroom) interior ceiling(except bathroom ceiling) exterior plastering 50%
5
10
Completed of plastering ,installing of vinyl door and window panels and accessories ,exterior ceiling, eave ceiling and primer painting
6
10
Completed of all floor surface,stairs ,bathroom tiles and 1 final coating
7
5
Completion of the construction
 
Installment for pre-cast structure Socket System 2 storey house price exceed 6 million Baht
installment
PAYMENT (%)
Descriptions
10
On the contract signing date
1
20
Completed of locate lay-out,piling work,foundation work
2
20
Completed of beam, column,first floor casting,second floor casting,roof beam,roof truss(except lower roof)
3
10
Completion of roof tiles (except lower roof),brick laying 80%,interior plumbing (pressure tested)
4
10
Completion of brick laying 100% conduit for wiring interior plastering 80%
5
10
Completion of interior ceiling (except in the bathroom) interior wiring exterior plastering 80%
6
10
Completion of plastering 100%, vinyl door and window installing and accessories,interior ceiling,exterior ceiling,primer painting
7
5
Completion of bathroom tiles,all floor surface materials,1final coating
8
5
Completion of the construction
 
Installment for pre-cast structure Socket System 3 storey house
installment
PAYMENT (%)
Descriptions
10
On the contract signing date
1
20
Completed of locate lay-out,piling work,foundation work  
2
20
On the completion of beam column first-third floor casting.roof trusses
3
10
Completion of roof tiles(except lower roof),brick laying 80%conduit for wiring
4
10
Completion of exterior plastering 80%,exterior plastering 50%,interior plumbing(pressure tested)
5
10
Completion of plastering 100%,interior ceiling (except bathroom  ceiling) exterior ceiling,eave ceiling
6
10
Completion of vinyl door and window panels installing with accessories,bathroom tiles 50%,primer paint,4 final coating
7
5
Completion of all floor surface materials,bathroom tiles and stairs
8
5
Completion of the construction

 
Which of the following trade fairs that you are interested most?
   
Architect Expo 13
BaanLaeSuan Fair 2013
House and Condo Show 2013
Home Builder 2013
   
 
 
   Counters